November road closures as Lincoln Alexander Hall connects to local services


To connect the new Lincoln Alexander Hall (LAH) residence building with local water and sewer services, road closures around the site will begin in early November.

These closures are staggered throughout the month to minimize disruption to residents and local traffic.

The staggered closures are listed below. Please visit the Lincoln Alexander Hall project page for project updates.

Nov. 4 to Nov. 14

From Nov. 4 to Nov. 14, the eastbound lane of Traymore Avenue will be closed from Forsyth Avenue South to Dalewood Avenue. Traffic control personnel will be on site to ensure resident access.

Aerial map view of streets with graphics illustrating the work area and road closure on Traymore Avenue South.


Nov. 18 to Nov. 22

From Nov. 18 to Nov. 22, the covered sidewalk in front of LAH on Main Street West and a westbound traffic lane of Main Street West will be closed. Signs will direct pedestrians to use other sidewalks.

Aerial map view of streets with graphics illustrating the work area and where the sidewalk and the right lane of traffic will be closed along the north side of Main Street West on the perimeter of the Lincoln Alexander Hall construction.


Nov. 25 to Nov. 28

From Nov. 25 to Nov. 28, the northbound lane of Forsyth Avenue South, along the west side of LAH, will be closed. Traffic control personnel will be on site to keep traffic moving.

Aerial map view of streets with graphics illustrating the work area and closures on Forsyth Avenue South.