GO Transit users re-routed through Keyes residence lobby to get to buses


Update Tuesday, April 1: The walkway closure will continue through April 4.

a map illustrating the area that will be closed during crane lift operation until April 4.From Monday, March 31 through Friday, April 4, the pedestrian walkway between the Mary E. Keyes residence and the E.T. Clarke Centre will be closed because of a crane lift operation.

GO Transit users will need to travel through the lobby of the Keyes building, and should plan for extra time getting to buses.